Solving the Short-Term Scheduling Problem of Hydrothermal Systems via Lagrangian Relaxation and Augmented Lagrangian

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving the Short-Term Scheduling Problem of Hydrothermal Systems via Lagrangian Relaxation and Augmented Lagrangian

This paper addresses the short-term scheduling problem of hydrothermal power systems, which results in a large-scale mixed-integer nonlinear programming problem. The objective consists in minimizing the operation cost over a two-day horizon with a one-hour time resolution. To solve this difficult problem, a Lagrangian Relaxation LR based on variable splitting is designed where the resulting dua...

متن کامل

Solving the Hydrothermal Unit Commitment Problem via Lagrangian Relaxation and Augmented Lagrangian

This paper considers the hydrothermal unit commitment problem of power systems with high proportion of hydraulic generation. In this sense, a large-scale mixed-integer nonlinear programming problem for the two day cost-optimal generation of system is developed. The model involves a large number of mixed-integer decision variables and constraints linking time periods and operation units. A Lagra...

متن کامل

A SIMPLIFIED LAGRANGIAN MULTIPLIER APPROACH FOR FIXED HEAD SHORT-TERM HYDROTHERMAL SCHEDULING

This paper presents a simplifiedlagrangian multiplier based algorithm to solve the fixed head hydrothermalscheduling problem. In fixed head hydrothermal scheduling problem, waterdischarge rate is modeled as quadratic function of hydropower generation andfuel cost is modeled as quadratic function of thermal power generation. Thepower output of each hydro unit varies with the rate of water discha...

متن کامل

Short-term Generation Scheduling with Transmission and Environmental Constraints Using an Augmented Lagrangian Relaxation

This paper proposes a new approach based on augmented Lagrangian relaxation for short term generation scheduling problem with transmission and environmental constraints. In this method, the system constraints, e.g. load demand, spinning reserve, transmission capacity and environmental constraints, are relaxed by using Lagrangian multipliers, and quadratic penalty terms associated with system lo...

متن کامل

a simplified lagrangian multiplier approach for fixed head short-term hydrothermal scheduling

this paper presents a simplifiedlagrangian multiplier based algorithm to solve the fixed head hydrothermalscheduling problem. in fixed head hydrothermal scheduling problem, waterdischarge rate is modeled as quadratic function of hydropower generation andfuel cost is modeled as quadratic function of thermal power generation. thepower output of each hydro unit varies with the rate of water discha...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2012

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2012/856178