Solving an EPQ Model with Rework and Service Level Constraint

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving an Epq Model with Rework and Service Level Constraint

This paper examines an economic production quantity (EPQ) model with rework and service level constraint. First, we prove that the expected overall costs for an imperfect EPQ model with backlogging permitted is less than or equal to that of the one without backlogging. Secondly, the relationship between “imputed backorder cost” and maximal shortage level is derived for decision-making on whethe...

متن کامل

Environmentally Responsible EPQ Model with Rework Process of Defective Items

A real economic growth only comes from increasing quality and quantity of the factors of production. Most production systems produce items which are of imperfect quality. In a production/inventory situation items which are received or produced are not of perfect quality. Thus the presence of defects which is inevitable in a produced/ordered lot is sorted out by the process of screening. Handlin...

متن کامل

An Economic Production Quantity Model for Defective Items with Sales Return Service, Scrap Items and Rework

In this model, we establish an inventory model to determine the optimal inventory replenishment scheme for the economic production quantity (EPQ) model for imperfect, deteriorating items with sales return service under multiple production and rework setup. In one cycle, production process can produces the products in m production setups and reworks the defective items in one rework setup. The c...

متن کامل

An EPQ model with a random breakdown, rework, and a discontinuous issuing policy

This study attempts to determine the optimal production run time for an economic production quantity (EPQ) model with a Poisson breakdown rate, the rework of nonconforming items, and multi-delivery of finished products. It is assumed that nonconforming items can be randomly produced and repaired through a rework process added at the end of the production process. Production equipment is subject...

متن کامل

An Algebraic Approach for Determining the Optimal Lot Size for Epq Model with Rework Process

This paper presents a simple algebraic approach for deriving the optimal lot size for economic production quantity (EPQ) model with rework process. Conventional methods for solving lot size problems are by using differential calculus on the long-run average production-inventory cost function with the need to prove optimality first. A few recent articles proposed the algebraic approach to the so...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical and Computational Applications

سال: 2006

ISSN: 2297-8747

DOI: 10.3390/mca11010075