Solving a novel multi-skilled project scheduling model by scatter search

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving a Novel Multi-skilled Project Scheduling Model by Scatter Search

A multi-skilled project scheduling problem (MSPSP) has generally been presented to schedule information technology projects in deterministic conditions. The contribution of this model is to consider the resources, called ‘staff members’. These members are regarded as valuable, renewable, and discrete resources with different multiple skills. The different skills of staff members, as well as the...

متن کامل

Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...

متن کامل

Solving a mixed-integer linear programming model for a multi-skilled project scheduling problem by simulated annealing

Article history: Received July 20, 2011 Received in Revised form October, 12, 2011 Accepted 15 October 2011 Available online 20 October 2011 A multi-skilled project scheduling problem (MSPSP) has been generally presented to schedule a project with staff members as resources. Each activity in project network requires different skills and also staff members have different skills, too. This causes...

متن کامل

A hybrid scatter search/electromagnetism meta-heuristic for project scheduling

In the last few decades, several effective algorithms for solving the resource-constrained project scheduling problem have been proposed. However, the challenging nature of this problem, summarised in its strongly NP-hard status, restricts the effectiveness of exact optimisation to relatively small instances. In this paper, we present a new meta-heuristic for this problem, able to provide near-...

متن کامل

The Integrated Supply Chain of After-sales Services Model: A Multi-objective Scatter Search Optimization Approach

Abstract: In recent decades, high profits of extended warranty have caused that third-party firms consider it as a lucrative after-sales service. However, customers division in terms of risk aversion and effect of offering extended warranty on manufacturers’ basic warranty should be investigated through adjusting such services. Since risk-averse customers welcome extended warranty, while the cu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The South African Journal of Industrial Engineering

سال: 2013

ISSN: 2224-7890

DOI: 10.7166/24-1-651