Solving a multi-mode bi-objective resource investment problem using meta-heuristic algorithms

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Bi-objective Model of Hotel Revenue Management Considering Customer Choice Behavior Using Meta-heuristic Algorithms

The problem of maximizing the benefit from a specified number of a particular product with respect to the behavior of customer choices is regarded as revenue management. This managerial technique was first adopted by the airline industries before being widely used by many others such as hotel industries. The scope of this research is mainly focused on hotel revenue management, regarding which a...

متن کامل

Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

A mathematical model for the multi-mode resource investment problem

This paper presents an exact model for the resource investment problem with generalized precedence relations in which the minimum or maximum time lags between a pair of activities may vary depending on the chosen modes. All resources considered are renewable. The objective is to determine a mode and a start time for each activity so that all constraints are obeyed and the resource investment co...

متن کامل

Meta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain

In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...

متن کامل

Solving a Multi-Item Supply Chain Network Problem by Three Meta-heuristic Algorithms

The supply chain network design not only assists organizations production process (e.g.,plan, control and execute a product’s flow) but also ensure what is the growing need for companies in a longterm. This paper develops a three-echelon supply chain network problem including multiple plants, multiple distributors, and multiple retailers with amulti-mode demand satisfaction policy inside of pro...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Advanced Computational Techniques in Electromagnetics

سال: 2015

ISSN: 2194-0266

DOI: 10.5899/2015/acte-00195