Solution Strategies for National Settlement System Planning Models
نویسندگان
چکیده
منابع مشابه
National Planning Models and Instruments
This paper focuses on the analysis and planning of multimodal, multiproduct transportation systems at the international, national, and regional levels, where the movements of several commodities through the transportation networks and services of several carriers are considered simultaneously. The main questions relate to the evolution of a given transportation system and its response to variou...
متن کاملFunctional MRI for presurgical planning: problems, artefacts, and solution strategies.
OBJECTIVES Presurgical mapping of motor function is a widely used clinical application of functional (f) MRI, employing the blood oxygenation level dependent contrast. The aim of this study was to report on 3 years experience of 194 fMRI studies on the representation of motor function in 103 patients and to describe the problems and artefacts that were typically present. METHODS An evaluation...
متن کاملStrategic Planning for the National Bridge Stock of Iran
The National Bridge Stock of Iran consists of about 330,000 bridges, of which around 50% are older than 30 years. Since 2010, Iran Road Maintenance & Transportation Organization has started implementing a comprehensive Bridge Management System in order to manage this aged stock efficiently. To predict future conditions of bridge stock, a heuristic numerical method is presented. This methodology...
متن کاملLocal Research Catalyzes National Surgical Planning; Comment on “Global Surgery – Informing National Strategies for Scaling Up Surgery in Sub-Saharan Africa”
In 2015 the Lancet Commission on Global Surgery (LCoGS) argued that surgical care is important to national health systems along with the economic viability of countries. Gajewski and colleagues outlined how the Commission’s blueprint has been implemented in sub-Saharan Africa, including two funded research projects that were integrated into national surgical plans. Here...
متن کاملPlanning for sites having ability to temporary settlement in urban scale in AHP method in Qom
Background and objective: The necessity of pre-disaster reconstruction planning is obvious since Iran is located in the Alpine-Himalayas seismic belt as well as according to several earthquake experiments in different urban and rural regions. Qom is one of the high risk zones in Iran (code 2800). On the other hand, there aren’t any experiments for temporary settlement after earthquake in conce...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Geographical Analysis
سال: 2010
ISSN: 0016-7363
DOI: 10.1111/j.1538-4632.1980.tb00019.x