Solution of a Bi-Objective Purchasing Scheduling Problem with Constrained Funds using Pareto Optimization
نویسندگان
چکیده
منابع مشابه
Solution of a Bi-Objective Purchasing Scheduling Problem with Constrained Funds using Pareto Optimization
In this paper the Purchasing Scheduling Problem (PSP) with limited funds is presented. PSP is formulated through the optimization of two objectives based on the inventory-supply process: maximization of satisfied demands and minimization of purchasing costs. The problem is solved using two variants of the Ant Colony System algorithm (ACS), designed under Pareto's optimization principle in which...
متن کاملsolution of security constrained unit commitment problem by a new multi-objective optimization method
چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...
Using Multi-Objective Particle Swarm Optimization for Bi-objective Multi-Mode Resource-Constrained Project Scheduling Problem
In this paper the multi-mode resource-constrained project scheduling problem with discounted cash flows is considered. Minimizing the makespan and maximization the net present value (NPV) are the two common objectives that have been investigated in the literature. We apply one evolutionary algorithm named multiobjective particle swarm optimization (MOPSO) to find Pareto front solutions. We used...
متن کاملEquispaced Pareto front construction for constrained bi-objective optimization
We consider constrained biobjective optimization problems. One of the extant issues in this area is that of uniform sampling of the Pareto front. We utilize equispacing constraints on the vector of objective values, as discussed in a previous paper dealing with the unconstrained problem. We present a direct and a dual formulation based on arc-length homotopy continuation and illustrate the dire...
متن کاملA Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities
In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Research in Computing Science
سال: 2015
ISSN: 1870-4069
DOI: 10.13053/rcs-104-1-3