Software Size Estimation Using Activity Point

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Software Cost Estimation using Function Point with Non Algorithmic Approach

Cost estimation is one of the most challenging tasks in project management. It is to accurately estimate needed resources and required schedules for software development projects. The software estimation process includes estimating the size of the software product to be produced, estimating the effort required, developing preliminary project schedules, and finally, estimating overall cost of th...

متن کامل

-Estimation of Software Size and Effort Distributions

All too frequently, a software cost estimate is required in the early stages of the life-cycle when requirements and design specifications are immature. To produce a cost estimate under these conditions requires extensive use of expert judgment and addressing significant estimation uncertainty. Research has shown that expert judgment under the right conditions can yield relatively "accurate" es...

متن کامل

Embedded Software Memory Size Estimation Using COSMIC: A Case Study IWSM/MetriKon/Mensura 2010 Embedded Software Memory Size Estimation Using COSMIC: A Case Study

Early and accurate memory size estimation of Electronic Control Units (ECUs), which are dedicated embedded systems providing major software functionalities, is essential for automotive industry. Usually, experts using their expert judgments perform the estimations. Software functional size measures, which attempt at measuring the size by capturing the amount of functionality, have become popula...

متن کامل

Statistical Analysis for Activity-Based Software Estimation using Regression Approach

Application Service Maintenance(ASM) projects mainly use Activity-Based software estimation methodology compared to Function Point or Lines of Code Estimation methodologies[1]. This is due to the nature of execution of ASM Projects differ with nature of execution of development projects. Activity based estimation methodology breaks estimation at each sub activities level of Software Development...

متن کامل

Displaying Correlations using Position , Motion , Point Size or Point Colour

An empirical study is presented which explores the use of motion, point size and grey scales for the display of statistical data; specifically, the perception of correlations between variables. The task is to measure the subject's ability to perceive differences between high correlation and low correlation for a two dimensional plot presented in different ways. One variable is always mapped to ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Materials Science and Engineering

سال: 2017

ISSN: 1757-8981,1757-899X

DOI: 10.1088/1757-899x/185/1/012013