Software Project Contacts by GRGA Scheduling and EVM
نویسندگان
چکیده
منابع مشابه
Software /4-DQPSK Modem: A Student Project Using the TMS320C6201 EVM Board
This paper reports on a student project performed at the University of Southampton jointly by 4th year MEng students within the course “Advanced Radio Communications”. The aim was to design a software modem capable of transmitting 16kb/s of data, whereby random number generation, advanced modulation, pulse shaping, synchronisation, and error counting techniques had to be applied. The ultimate a...
متن کاملApplying Process Simulation to Software Project Scheduling
Good project scheduling is an essential yet extremely hard task in software management practice. The time needed to complete a development activity usually is known only roughly. Often, the completion of an activity is delayed due to unanticipated rework. In this paper, we show how process simulation can be utilized in order to support software managers in finding good schedules for their proje...
متن کاملA Hybrid Approach for Software Project Scheduling
This research work handles Software project scheduling problem with a hybrid approach. In this, a hybrid approach can handle combination of two different algorithms they are Event Based Scheduler(EBS) and Ant Colony Optimization(ACO). Which provide scheduling and also allocate the resources based on the project. The basic idea of the EBS is to adjust the allocation of employees at events and ke...
متن کاملIntelligent Software Project Scheduling and Team Staffing with Genetic Algorithms
Software development organisations are under heavy pressure to complete projects on time, within budget and with the appropriate level of quality, and many questions are asked when a project fails to meet any or all of these requirements. Over the years, much research effort has been spent to find ways to mitigate these failures, the reasons of which come from both within and outside the organi...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Computer Applications
سال: 2014
ISSN: 0975-8887
DOI: 10.5120/17064-7502