Software development for continuous-gas-flow AMS
نویسندگان
چکیده
منابع مشابه
Software development for continuous-gas-flow AMS
The National Ocean Sciences Accelerator Mass Spectrometry (NOSAMS) Facility at Woods Hole Oceanographic Institution is presently completing installation of a novel continuous-flow AMS system. A multi-year development of an AMS microwave gas ion source in collaboration with Atomic Energy Canada Limited (AECL), Chalk River, has preceded this final step of an implementation that is expected to add...
متن کاملA gas ion source for continuous-flow AMS
The first gas-fed ion source for radiocarbon AMS applications (without sputtering) has been operated at the Woods Hole NOSAMS Facility. A three-year, off-line test program resulted in positive carbon ion currents up to 1 mA and negative ion currents up to 80 lA. Recently, the compact, permanent-magnet microwave plasma ion source and magnesium vapor charge-exchange canal were coupled to the reco...
متن کاملSoftware Development for Simulation of Reformer Furnace
In recent years, lots of research has been done on effective usage of natural gas; the first step in these processes is conversion of natural gas to Syngas. Natural gas reforming process by refomer furnace is commonly used for syngas and hydrogen production. In this paper, a windows based software, RIPI-RefSim, is introduced. By using proper heat, mass, kinetic and thermodynamic models as w...
متن کاملContinuous Improvement Framework for Global Software Development
Overview and Motivation Rapid development of the telecommunication industry progressively introduces new and enhanced functionalities into existing software systems thus increasing the system size and complexity. The software systems of telecommunication equipment become very large software systems where high reliability requirements are even harder to reach. The most common project type for de...
متن کاملRequirements Management for Continuous Software Product Development
Background: Continuous software product development is increasingly becoming the norm. New requirements come in a constant stream and need to be assigned to projects to make it into a release. However, in the literature requirements management practices are project based and no longer naturally fit to this new setting. Aim: Thus, it is of interest to understand the industrial practices for the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms
سال: 2008
ISSN: 0168-583X
DOI: 10.1016/j.nimb.2008.03.001