Software cost estimation with incomplete data
نویسندگان
چکیده
منابع مشابه
Software Cost Estimation with Incomplete Data
The construction of software cost estimation models remains an active topic of research. The basic premise of cost modelling is that a historical database of software project cost data can be used to develop a quantitative model to predict the cost of future projects. One of the difficulties faced by workers in this area is that many of these historical databases contain substantial amounts of ...
متن کاملA Novel ICA-based Estimator for Software Cost Estimation
One of the most important and valuable goal of software development life cycle is software cost estimation or SCE. During the recent years, SCE has attracted the attention of researchers due to huge amount of software project requests. There have been proposed so many models using heuristic and meta-heuristic algorithms to do machine learning process for SCE. COCOMO81 is one of the most popular...
متن کاملMaximum Entropy Density Estimation with Incomplete Data
We propose a natural generalization of Regularized Maximum Entropy Density Estimation (maxent) to handle input data with unknown values. While standard approaches to handling missing data usually involve estimating the actual unknown values, then using the estimated, complete data as input, our method avoids the two-step process and handles unknown values directly in the maximum entropy formula...
متن کاملA New Approach to Software Cost Estimation by Improving Genetic Algorithm with Bat Algorithm
Because of the low accuracy of estimation and uncertainty of the techniques used in the past to Software Cost Estimation (SCE), software producers face a high risk in practice with regards to software projects and they often fail in such projects. Thus, SCE as a complex issue in software engineering requires new solutions, and researchers make an effort to make use of Meta-heuristic algorithms ...
متن کاملSoftware cost estimation
The paper gives an overview of the state o f the art o f software cost estimation (SCE). The main questions to be answered in the paper are: (I) What are the reasons for overruns o f budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be estimated? (4) What can software project management expect from SCE models, how accurate are ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Software Engineering
سال: 2001
ISSN: 0098-5589
DOI: 10.1109/32.962560