SOCIAL WELFARE MAXIMIZATION IN DEREGULATED POWER SYSTEM
نویسندگان
چکیده
منابع مشابه
Deregulated Power System
This paper presents the AGC controllers to regulate the system frequency and to regulate the power generation of various GENCOs at scheduled levels in a deregulated power system by optimizing the parameters of controller using Evolutionary Real coded genetic algorithm (RCGA). The performance of the controller is investigated on a two-area interconnected power system consisting of Hydro-Thermal ...
متن کاملSocial Welfare Maximization for Hybrid Market
Electricity markets throughout the world continue to be opened to competitive forces. The underlying objective of introducing competition to these markets is to make them more efficient. It is a general concept of capitalism that if fair and equitable market structures are created, which give all market participants incentives to maximize their own individual welfare, then the market as a whole...
متن کاملCell Coverage based on Social Welfare Maximization
We introduce a new approach, based on social welfare maximization, for determining the coverage of a single cell in a WCDMA system. The approach takes into account resource usage in the uplink direction, and captures the tradeoff between having a large cell with many users versus having a smaller cell with fewer users, which however are able to transmit at a higher rate. Our numerical investiga...
متن کاملOptimal generation scheduling strategy for profit maximization of genco in deregulated power system
A GA based optimal generation scheduling strategy is developed to solve the profit maximization problem for GENCO in the day ahead market. It is a multi objective formulation that includes the forecasted demand, forecasted market clearing price, startup cost and profit functions, besides the generating limits and demand constraints. The proposed GA approach is investigated on three unit and ten...
متن کاملA Novel LR-QPSO Algorithm for Profit Maximization of GENCOs in Deregulated Power System
The electric power industry need changes in various power system operation, control and planning activities. Generation companies (GENCOs) schedule their generators with an objective to maximize their own profit rather than compromising on social benefit. Power and reserve prices become important factors in decision process. GENCOs decision to commit generating units is associated with financia...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Power System Operation and Energy Management
سال: 2013
ISSN: 2231-4407
DOI: 10.47893/ijpsoem.2013.1061