Smectites: The key to the cost overruns in the construction of the third set of locks of the Panama Canal
نویسندگان
چکیده
The third set of locks the Panama Canal is one most impressive civil infrastructures in world. Its construction, however, was delayed by two years incurring cost overruns billions that were mainly related to use local basalt as raw material for concrete production. rapid degradation during construction an apparent sound resulted huge loss fines manufacturing concrete. In rock, olivine and glass are, respectively, altered iddingsite palagonite are composed smectites. Smectites also found around plagioclase pyroxene crystals filling dense network micro- nano-cracks. Moreover, these smectites spatially interconnected, which key explaining unexpected behavior basalt. Such a basic igneous rocks – exposed weather then utilized not frequent, yet it significant enough call development new standard materials construction.
منابع مشابه
romantic education:reading william wordsworths the prelude in the light of the history of ideas
عصر روشنگری زمان شکل گیری ایده های مدرن تربیتی- آموزشی بود اما تاکید بیش از اندازه ی دوشاخه مهم فلسفی زمان یعنی عقل گرایی و حس گرایی بر دقت و وضوح، انسان عصر روشنگری را نسبت به دیگر تواناییهایش نابینا کرده و موجب به وجود آمدن افرادی تک بعدی شد که افتخارعقلانیتشان، تاکید شان بر تجربه فردی، به مبارزه طلبیدن منطق نیاکانشان وافسون زدایی شان از دنیا وتمام آنچه با حواس پنجگانه قابل درک نبوده و یا در ...
the analysis of the role of the speech acts theory in translating and dubbing hollywood films
از محوری ترین اثراتی که یک فیلم سینمایی ایجاد می کند دیالوگ هایی است که هنرپیش گان فیلم میگویند. به زعم یک فیلم ساز, یک شیوه متأثر نمودن مخاطب از اثر منظوره نیروی گفتارهای گوینده, مثل نیروی عاطفی, ترس آور, غم انگیز, هیجان انگیز و غیره, است. این مطالعه به بررسی این مسأله مبادرت کرده است که آیا نیروی فراگفتاری هنرپیش گان به مثابه ی اعمال گفتاری در پنج فیلم هالیوودی در نسخه های دوبله شده باز تولید...
15 صفحه اولthe effect of taftan pozzolan on the compressive strength of concrete in the environmental conditions of oman sea (chabahar port)
cement is an essential ingredient in the concrete buildings. for production of cement considerable amount of fossil fuel and electrical energy is consumed. on the other hand for generating one tone of portland cement, nearly one ton of carbon dioxide is released. it shows that 7 percent of the total released carbon dioxide in the world relates to the cement industry. considering ecological issu...
study of cohesive devices in the textbook of english for the students of apsychology by rastegarpour
this study investigates the cohesive devices used in the textbook of english for the students of psychology. the research questions and hypotheses in the present study are based on what frequency and distribution of grammatical and lexical cohesive devices are. then, to answer the questions all grammatical and lexical cohesive devices in reading comprehension passages from 6 units of 21units th...
ذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Engineering Geology
سال: 2021
ISSN: ['1872-6917', '0013-7952']
DOI: https://doi.org/10.1016/j.enggeo.2021.106036