Slopes stability analysis from Rosia Poieni open pit mine, Romania

نویسندگان

چکیده

In the case of Roşia Poieni open pit mine level +805 m was established as a daily operating limit; division into benches based on this by dividing horizontal slices with thickness 15 m, equal to height bench. Thus, there were 27 in Curmătura area and 23 Ruginiş area. The general slope angle set at 35°, for which tailings volumes implicitly opening-up coefficient calculated. stability analysis performed individual bench, 2 system quarry (consisting 24 benches), using two methods (Fellenius Janbu). A polygonal slip surface also modelled; such potential landslide surfaces can appear slopes due natural cracking systems massif but secondary generated used drilling-blasting works (exploitation technology). check done applying Hoek’s graphical-analytical method; determined values safety factor satisfy condition being greater than 1.3. these circumstances, no further measures are required increase reserve.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A comparison between effects of earthquake and blasting on stability of mine slopes: a case study of Chadormalu open-pit mine

Dynamic slope stability in open-pit mines still remains a challenging task in the computational mining design. Earthquake and blasting are two significant sources of dynamic loads that can cause many damages to open-pit mines in active seismic areas and during exploitation cycles. In this work, the effects of earthquake and blasting on the stability of the NW slope of Chadormalu mine are compar...

متن کامل

slope stability analysis and assessment for further major failure of angooran open-pit mine

slope stability is one of the major and determiner parameters in the economy and safety of open pit mines. failure and consequently rupture of the slope caused no compensable economic and humanity losses. so, probability assessment of the further failure for presentation of damages and additional costs is of prime importance. in this research, stability analysis and probability assessment of th...

متن کامل

Stability Analysis and Design of Open- Pit Mine Slope in China: A review

Based on current researches and developments of open-pit mine slope in China, the engineering features of open-pit mine slopes are summarized. Mine slope is basically formed by dynamic excavation of multi-level and multi-type, and mining benefit is the purpose of mine slope engineering when using various schemes and/or methods. Thus, the issues of design and stability analyses are the main conc...

متن کامل

A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

A continuous model for open pit mine planning∗

This paper proposes a new mathematical model for the open pit mine planning problem, based on continuous functional analysis. The traditional models for this problem have been constructed by using discrete 0−1 decision variables, giving rise to large-scale combinatorial and Mixed Integer Programming (MIP) problems. Instead, we use a continuous approach which allows for a refined imposition of s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: MATEC web of conferences

سال: 2021

ISSN: ['2261-236X', '2274-7214']

DOI: https://doi.org/10.1051/matecconf/202134202005