Size Spectra of Sprays at Flip-Through Overtopping
نویسندگان
چکیده
منابع مشابه
Uniform Heat Transfer of Medical Cryogen Sprays through Wire Meshes
Cryogen spray cooling (CSC) protects the epidermal layer during dermatologic laser surgery (DLS) of superficial vascular lesions. Because of spray characteristics the protection provided radially is relatively uniform only by the spray axis. The present work explores mass-deposition passive-control during CSC in order to increase the radial homogeneity of heat extraction. A stainless steel mesh...
متن کاملEmbankment overtopping protection systems
For the last decades, the design floods of numerous embankment reservoirs were re-evaluated, and the revised spillway outflows are typically larger than those used in the original designs. As a result, a number of overtopping protection systems were developed for embankments and earthfill dams, with applications encompassing river dykes, coastal barriers for storm surge and tsunami protections....
متن کاملPrediction of Mean Overtopping Discharge at Vertical Seawalls Using MLR and GLM Statistical Approaches
Wave overtopping at breakwaters is one of their essential hydraulic characteristics when determining the design crest level. This study concentrates on developing a new practical formula on predicting wave overtopping, by implementing two different statistical models, Multiple Linear Regression model (MLR) and Generalized Linear Regression model (GLM). The models consider dependency of overtopp...
متن کاملComputer Simulation of Levee’s Erosion and Overtopping
The overall intent of this research is to develop numerical models of erosion of levees, dams and embankments, validated by physical models. The physical model tests were performed at 1-g and at high g’s using a geotechnical centrifuge facility. The erosion was modeled in detail, from beginning to end, that is from the time the levee was overtopped until the levee was breached. Typical quantiti...
متن کاملMultiple Batch Sizing through Batch Size Smoothing
Batch sizing in different planning period is categorized as a classical problem in production planning, that so many exact & heuristic methods have been proposed to solve this problem, each of which considering various aspects of the original problem. The solution obtained from majority – e.g. MRP – is in this format that there may be some periods of idleness or each period should produce a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: PROCEEDINGS OF COASTAL ENGINEERING, JSCE
سال: 2008
ISSN: 0916-7897,1884-8222
DOI: 10.2208/proce1989.55.76