Size doesn’t matter: Foeni-Sălaş, a small multi-period settlement in the Romanian Banat
نویسندگان
چکیده
Systematic archaeological excavations at the multicultural site of Foeni-S?la? in Romanian Banat conducted during first half 1990s uncovered evidence that was inhabited Early Neolithic, Copper, Bronze, Iron, Late Antique and Medieval Ages. This paper summarises cultural history settlement describes relevant deposits material culture each period.
منابع مشابه
mesuring the staff technology readiness, the case of a multi national chemical company operating in iran
چکیده ندارد.
15 صفحه اولFT-Raman and FT-Infrared investigations of archaeological artefacts from Foeni Neolithic site (Banat, Romania)
An impressive collection of chert artefacts from the Foeni Neolithic archaeological site (Timiş County, Banat region, Romania) is hosted by the Banat Museum in Timişoara. A representative set of seven specimens was non-destructively investigated using FT-Raman and ATR-FT-IR spectroscopy. The research was carried out for checking if these readily available, non-destructive, fast, and cheap metho...
متن کاملA hilltop settlement during the Migration Period
Archaeologists have long noted the striking monumentality and large-scale efforts behind the Iron Age hilltop settlements. Yet, because of limited excavations, they represent a controversial part of the Migration Period society and much of their function remains hidden. This paper deals with questions concerning the inner organization and activities that took place within the Iron Age hilltop s...
متن کاملSolving a New Multi-Period Mathematical Model of the Rail-Car Fleet Size and Car Utilization by Simulated Annealing
There is a significant interaction between sizing a fleet of rail cars and its utilization. This paper presents a new multi-period mathematical model and a solution procedure to optimize the rail-car fleet size and freight car allocation, wherein car demands, and travel times, are assumed to be deterministic, and unmet demands are backordered. This problem is considered NP-complete. In other wo...
متن کاملA Multi-Period 1-Center Location Problem in the Presence of a Probabilistic Line Barrier
This paper investigates a multi-period rectilinear distance 1-center location problem considering a line-shaped barrier, in which the starting point of the barrier follows the uniform distribution function. In addition, the existing points are sensitive to demands and locations. The purpose of the presented model is to minimize the maximum barrier distance from the new facility to the existing ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Starinar
سال: 2021
ISSN: ['0350-0241', '2406-0739']
DOI: https://doi.org/10.2298/sta2171021g