منابع مشابه
Materials Handling and Site Layout Control
Construction field operations are markedly inefficient in terms of where and how materials get stored and handled. This is often due uncertainty at the time of advance planning, the difficulties associated with achieving real-time coordination, and the lack of control in the field, as materials get delivered and used by many different people throughout the construction process. At any given poi...
متن کاملAn optimized layout for multipolar neural recording electrode
The propagation of action potentials along the axons can be recorded via the electrical activity of the nerve (electroneurogramm). This paper focuses on the use of cuff electrodes being very usual for chronic measurement. The main issues with this kind of electrode are parasitic noise and poor selectivity of the recorded signal. Then, we propose an optimized layout for multipolar recording elec...
متن کاملZone-Bit-Recording-Enhanced Video Data Layout Strategies
video-on-demand, VOD, video layout, zone-bit-recording, disk I/O performance Rapid progress in high speed networking and mass storage technologies has made it possible to provide video-on-demand (VOD) services, that deliver movies to viewers' homes on request. In this paper, we study video data layout issues in the video server design. Specifically, we present a family of novel video data layou...
متن کاملSimulation Applications in Construction Site Layout Planning
In the planning phase of every construction project, layout of temporary facilities is a crucial task; site layout can affect safety, travel cost and time, construction productivity, and space utilization. However, site layout planning can be a complicated problem, due to the interdependency of influencing factors. Although interaction among activities is one of the major drivers of site layout...
متن کاملDynamic Simulation and Visualization for Site Layout Planning
Purpose In recent years construction projects have become more complex and time-driven, especially with the rapid rise in the number of active partners involved in each project. Space is regarded as a limited resource on construction sites. Proper planning for site layouts ensuring construction activities can be executed safely and efficiently is until now a time-consuming manual process. Site ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Northeast Historical Archaeology
سال: 1971
ISSN: 0048-0738,0048-0738
DOI: 10.22191/neha/vol1/iss2/3