We address the NP-hard problem of scheduling n independent jobs with release dates, due dates, and family setup times on a single machine to minimize the maximum lateness. This problem arises from the constant tug-of-war going on in manufacturing between efficient production and delivery performance, between maximizing machine utilization by batching similar jobs and maximizing customers’ satis...
متن کاملSingle machine batch scheduling problem with family setup times and release dates to minimize makespan
In this paper we consider the single machine batch scheduling problem with family setup times and release dates to minimize makespan. We show that this problem is strongly NP-hard, and give an O n n m + 1 m time dynamic programming algorithm and an O(mk k P 2k−1) time dynamic programming algorithm for the problem, where n is the number of jobs, m is the number of families, k is the number of di...
متن کاملSingle-machine scheduling against due dates with past-sequence-dependent setup times
Recently Koulamas and Kyparisis (2006) introduced past-sequence-dependent setup times to scheduling problems. This means that the setup time of a job is proportionate to the sum of processing times of the jobs already scheduled. Koulamas and Kyparisis (2006) were able to show for a number of single-machine scheduling problems with completion time goals that they remain polynomially solvable. In...
متن کاملSingle Machine Scheduling with Release Dates
We consider the scheduling problem of minimizing the average weighted completion time of n jobs with release dates on a single machine. We first study two linear programming relaxations of the problem, one based on a time-indexed formulation, the other on a completiontime formulation. We show their equivalence by proving that a O(n logn) greedy algorithm leads to optimal solutions to both relax...
متن کاملSingle Machine Inserted Idle Time Scheduling with Release Times and Due Dates
The single machine scheduling problem is considered in which each task has a release dates, a processing time and a due date. The objective is to mimimize the maximum lateness. Preemption is not allowed. Scheduling problem 1|rj |Lmax is a NP-hard problem. We define an IIT (inserted idle time) schedule as a feasible schedule in which a processor is kept idle at a time when it could begin process...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Management Science
سال: 1996
ISSN: 0025-1909,1526-5501
DOI: 10.1287/mnsc.42.8.1165