Single-Machine Scheduling to Minimize Total Completion Time and Tardiness with Two Competing Agents

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single-Machine Scheduling to Minimize Total Completion Time and Tardiness with Two Competing Agents

We consider a single-machine two-agent problem where the objective is to minimize a weighted combination of the total completion time and the total tardiness of jobs from the first agent given that no tardy jobs are allowed for the second agent. A branch-and-bound algorithm is developed to derive the optimal sequence and two simulated annealing heuristic algorithms are proposed to search for th...

متن کامل

Single Machine Group Scheduling with Setups to Minimize Total Tardiness

This paper considers the single machine scheduling problem with independent family (group) setup times where jobs in each family are processed together. A sequence independent setup is required to process a job from a different family. The objective is to minimize total tardiness. A mixed integer programming model capable of solving small sized problems is described. Several heuristic algorithm...

متن کامل

Single machine scheduling with controllable processing times to minimize total tardiness and earliness

0360-8352/$ see front matter 2011 Elsevier Ltd. A doi:10.1016/j.cie.2011.08.019 ⇑ Corresponding author. Tel.: +98 111 2197584; fax E-mail addresses: [email protected] (V. Kay com (I. Mahdavi), [email protected] (G In most deterministic scheduling problems job processing times are considered as invariable and known in advance. Single machine scheduling problem with controllable proces...

متن کامل

Single machine scheduling with family setups to minimize total earliness and tardiness

This paper considers the problem of scheduling a given number of jobs on a single machine to minimize total earliness and tardiness when family setup times exist. The paper proposes optimal branch-and-bound algorithms for both the group technology assumption and if the group technology assumption is removed. A heuristic algorithm is proposed to solve larger problems with the group technology as...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The Scientific World Journal

سال: 2014

ISSN: 2356-6140,1537-744X

DOI: 10.1155/2014/596306