Single machine scheduling subject to precedence delays
نویسندگان
چکیده
منابع مشابه
Single Machine Scheduling Subject To Precedence Delays
A single-machine scheduling problem with precedence delays is analyzed. A set of n tasks is to be scheduled on the machine in such a way that the makespan is minimized. The executions of the tasks are constrained by precedence delays, i.e., a task can start its execution only after any of its predecessors has completed and the delay between the two tasks has elapsed. In the case of unit executi...
متن کاملSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...
متن کاملSingle-Machine Scheduling with Precedence Constraints
We discuss the problem of sequencing precedence-constrained jobs on a single machine to minimize the average weighted completion time. This problem has attracted much attention in the mathematical programming community since Sidney’s pioneering work in 1975 (Sidney, J. B. 1975. Decomposition algorithms for single machine scheduling with precedence relations and deferral costs. Operations Resear...
متن کاملApproximating Precedence-Constrained Single Machine Scheduling by Coloring
This paper investigates the relationship between the dimension theory of partial orders and the problem of scheduling precedenceconstrained jobs on a single machine to minimize the weighted completion time. Surprisingly, we show that the vertex cover graph associated to the scheduling problem is exactly the graph of incomparable pairs defined in dimension theory. This equivalence gives new insi...
متن کاملSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs and a mathematical model based on binary integer programming (BIP) is developed. Since the precedence constraints exist, a job cannot start before completion of its all predecessors. The proposed model consists of two steps: in the first step, the earliest starting time of each job is c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Discrete Applied Mathematics
سال: 1996
ISSN: 0166-218X
DOI: 10.1016/0166-218x(96)00110-2