Single machine scheduling problem with two synergetic agents and piece-rate maintenance
نویسندگان
چکیده
منابع مشابه
JIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملSingle-machine scheduling with piece-rate maintenance and interval constrained position-dependent processing times
This paper investigates single-machine scheduling problems with piece-rate machine maintenance and interval constrained actual processing time. The actual processing time of a job is a general function of the normal job processing time and the position in job sequence, and it is required to restrict in given interval otherwise earliness or tardiness penalty should be paid. The maintenance durat...
متن کاملA single-machine bi-criterion scheduling problem with two agents
The multiple-agent scheduling problems have received increasing attention recently. However, most of the research focuses on studying the computational complexity of the intractable cases or examining problems with a single criterion. Often a decision maker has to decide the schedule based on multiple criteria. In this paper, we consider a single machine problem where the objective is to minimi...
متن کاملSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...
متن کاملa heuristic algorithm for solving single machine scheduling problem with periodic maintenance
in this paper, the scheduling problem with nonresumable jobs and maintenance process is considered in order to minimize the makespan under two alternative strategies. the first strategy is to implement the maintenance process on the machine after a predetermined time period and the second one is to consider the maximum number of jobs that can be done with a special tool. we have proposed a new ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Mathematical Modelling
سال: 2013
ISSN: 0307-904X
DOI: 10.1016/j.apm.2012.04.009