Single Machine Scheduling and Slack Due-Date Assignment and Convex Resource Allocation Problem with Variable Job Processing Time and Maintenance
نویسندگان
چکیده
منابع مشابه
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملThe single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times
We study the earliness-tardiness scheduling problem on a single machine with due date assignment and controllable processing times. We analyze the problem with three different due date assignment methods and two different processing time functions. For each combination of these, we provide a polynomialtime algorithm to find the optimal job sequence, due date values and resource allocation minim...
متن کاملScheduling Jobs and a Variable Maintenance on a Single Machine with Common Due-Date Assignment
We investigate a common due-date assignment scheduling problem with a variable maintenance on a single machine. The goal is to minimize the total earliness, tardiness, and due-date cost. We derive some properties on an optimal solution for our problem. For a special case with identical jobs we propose an optimal polynomial time algorithm followed by a numerical example.
متن کاملDue-date assignment and maintenance activity scheduling problem
In the scheduling problem addressed in this note we have to determine: (i) the job sequence, (ii) the (common) due-date, and (iii) the location of a rate modifying (maintenance) activity. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. The processing time of a job scheduled after the maintenance activity decreases by a job-dependent facto...
متن کاملSingle-Machine Scheduling with Due-Date Assignment and Aging Effect under a Deteriorating Maintenance Activity Consideration
This study investigates single-machine due-date assignment and scheduling problems with a job-dependent aging effect under a deteriorating maintenance activity consideration simultaneously. The maintenance activity can be scheduled immediately after any one of the jobs has been completed. In order to model the problem more realistic, we assume that: (1) once the maintenance activity has been co...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Advances in Applied Mathematics
سال: 2018
ISSN: 2324-7991,2324-8009
DOI: 10.12677/aam.2018.74042