Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

متن کامل

Single-machine scheduling with past-sequence-dependent setup times and learning effects: a parametric analysis

Single-machine scheduling with past-sequence-dependent setup times and learning effects: a parametric analysis V. Mani, Pei-Chann Chang* and Shih-Hsin Chen Department of Aerospace Engineering, Indian Institute of Science, Bangalore, India; Department of Information Management, Yuan Ze University, 135, Yuan-Dong Road, Tao-Yuan 320, Taiwan, R.O.C.; Department of Electronic Commerce Management, Na...

متن کامل

A Job Shop Scheduling Problem with Sequence-Dependent Setup Times Considering Position-Based Learning Effects and Availability Constraints

 Sequence dependent set-up times scheduling problems (SDSTs), availability constraint and transportation times are interesting and important issues in production management, which are often addressed separately. In this paper, the SDSTs job shop scheduling problem with position-based learning effects, job-dependent transportation times and multiple preventive maintenance activities is studied. ...

متن کامل

Single-machine scheduling problems with past-sequence-dependent delivery times and position-dependent processing times

We consider single-machine scheduling problems with past-sequence-dependent (p-s-d) job delivery times. The p-s-d delivery time is needed to remove any waiting time-induced adverse effects on the job’s condition (prior to delivering the job to the customer) and it is therefore proportional to the job’s waiting time. We show that single-machine scheduling problems with p-s-d delivery times and w...

متن کامل

Minimizing Total Weighted Completion Time on Single Machine with Past-Sequence-Dependent Setup Times and Exponential Time-Dependent and Position-Dependent Learning Effects

This paper addresses a single-machine problem in which the past-sequence-dependent p-s-d setup times and exponential time-dependent and position-dependent learning effects are considered. By the exponential time-dependent learning effect, it means that the processing time of a job is defined by an exponent function of the total actual processing time of the already processed jobs. The setup tim...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Mathematical Modelling

سال: 2011

ISSN: 0307-904X

DOI: 10.1016/j.apm.2010.09.017