Single Machine Job Sequencing With a Restricted Common Due Window

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Common Due Window Scheduling with Both Time and Position Effects on a Single Machine

We consider the problem of common due window location scheduling on a single machine, where the processing times of jobs depend both on their starting times and positions in a sequence. The problem is to determine the optimal earliest due date, the due window size, and the job schedule simultaneously to minimize costs for earliness, tardiness, earliest due date assignment and due window size pe...

متن کامل

Single Machine Common Due Date with Job Dependent Earliness and Tardiness Penalties Problem Using Neural Network

We consider the problem of scheduling of n jobs to minimize the total earliness and tardiness penalty. The scheduling objective is to minimize the sum of job dependent earliness and tardiness penalties.. After determining the scheduling for single machine common due date, using neural network, the result shows that the neural network solution performs very well.

متن کامل

Genetic Algorithms for Single Machine Job Scheduling with Common Due Date and Symmetric Penalties

A single machine n-job scheduling problem is examined to minimize sum of absolute deviations of completion times from a common due date. Simple and hybrid genetic Algorithms are developed by investigating basic operators for the applications of job sequencing problems. For the simple genetic algorithm two heuristic crossover schemes: Algorithm VASX and Algorithm VADX are developed based on impo...

متن کامل

An approximation algorithm and FPTAS for Tardy/Lost minimization with common due dates on a single machine

This paper addresses the Tardy/Lost penalty minimization with common due dates on a single machine. According to this performance measure, if the tardiness of a job exceeds a predefined value, the job will be lost and penalized by a fixed value. Initially, we present a 2-approximation algorithm and examine its worst case ratio bound. Then, a pseudo-polynomial dynamic programming algorithm is de...

متن کامل

Stochastic Single Machine Scheduling with Random Common Due Date

This paper studies the single machine scheduling problem for minimizing the expected total weighted deviations of completion times from random common due date. Jobs have exponentially distributed processing times and the common due date is a generalized Erlang distribution. The optimal schedules are shown to be ⁄-shaped. Moreover, we give the optimal schedules when the machine is subject to sto...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Access

سال: 2019

ISSN: 2169-3536

DOI: 10.1109/access.2019.2946032