Single Machine Group Scheduling with Position Dependent Processing Times and Ready Times
نویسندگان
چکیده
منابع مشابه
Single-machine scheduling problems with past-sequence-dependent delivery times and position-dependent processing times
We consider single-machine scheduling problems with past-sequence-dependent (p-s-d) job delivery times. The p-s-d delivery time is needed to remove any waiting time-induced adverse effects on the job’s condition (prior to delivering the job to the customer) and it is therefore proportional to the job’s waiting time. We show that single-machine scheduling problems with p-s-d delivery times and w...
متن کاملScheduling jobs with position-dependent processing times
Bachman and Janiak provided a sketch of the proof that the problem 1|ri,pi(v)1⁄4 ai/v|Cmax is NP-hard in the strong sense. However, they did not show how to avoid using harmonic numbers whose encoding is not pseudo-polynomial, which makes the proof incomplete. In this corrigendum, we provide a new complete proof. Journal of the Operational Research Society (2012) 63, 1018–1020. doi:10.1057/jors...
متن کاملMachine scheduling with resource dependent processing times
We consider several parallel machine scheduling settings with the objective to minimize the schedule makespan. The most general of these settings is unrelated parallel machine scheduling. We assume that, in addition to its machine dependence, the processing time of any job is dependent on the usage of a scarce renewable resource. A given amount of that resource, e.g. workers, can be distributed...
متن کاملBicriterion Single Machine Scheduling with Resource Dependent Processing Times
A bicriterion problem of scheduling jobs on a single machine is studied. The processing time of each job is a linear decreasing function of the amount of a common discrete resource allocated to the job. A solution is specified by a sequence of the jobs and a resource allocation. The quality of a solution is measured by two criteria, F1 and F2. The first criterion is the maximal or total (weight...
متن کاملSingle-machine scheduling with time window-dependent processing times
In the one-machine scheduling problems analysed in this paper, the processing time of a job depends on the time at which the job is started. More precisely, the horizon is divided into time windows and with each one a coe cient is associated that is used to determine the actual processing time of a job starting in it. Two models are introduced, and one of them has direct connections with models...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematical Problems in Engineering
سال: 2015
ISSN: 1024-123X,1563-5147
DOI: 10.1155/2015/206230