Sine-Cosine Algorithm to Enhance Simulated Annealing for Unrelated Parallel Machine Scheduling with Setup Times
نویسندگان
چکیده
منابع مشابه
A Hybrid Algorithm for Solving the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Times
This work addresses the unrelated parallel machine scheduling problem where setup times are sequence-dependent and machine-dependent. The maximum completion time of the schedule, known as makespan, is considered as an objective to minimize. Few studies has been done about this problem, which is a motivation to the development of this work. Other motivations are the fact that it is NP-Hard and i...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملA Simulated Annealing Algorithm For The Unrelated Parallel Machine Scheduling Problem
The problem addressed in this paper is scheduling jobs on unrelated parallel machines with sequence-dependent setup times to minimize the maximum completion time (i.e., the makespan). This problem is NP-hard even without including setup times. Adding sequence-dependent setup times adds another dimension of complexity to the problem and obtaining optimal solutions becomes very difficult especial...
متن کاملPareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...
متن کاملHeuristics for the Unrelated Parallel Machine Scheduling Problem with Setup Times
The problem addressed in this paper is the non-preemptive unrelated parallel machine scheduling problem with the objective of minimizing the makespan. Machine-dependent and job sequence-dependent setup times are considered, all jobs are available at time zero, and all times are deterministic. This is a NP-hard problem and in this paper, optimal solutions are found for small problems only. For l...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematics
سال: 2019
ISSN: 2227-7390
DOI: 10.3390/math7111120