SIMULTANEOUS PRICING, DUE-DATE SETTING AND SCHEDULING FOR MAKE-TO-ORDER FIRMS WITH CONTINGENT ORDERS

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated model for pricing, delivery time setting, and scheduling in make-to-order environments

Usually, in make-to-order environments which work only in response to the customer’s orders, manufacturers for maximizing the profits should offer the best price and delivery time for an order considering the existing capacity and the customer’s sensitivity to both the factors. In this paper, an integrated approach for pricing, delivery time setting and scheduling of new arrival orders are prop...

متن کامل

Scheduling and Due-Date Quotation in a Make-to-Order Supply Chain

We consider a manufacturer, served by a single supplier, who has to quote due dates to arriving customers in a maketo-order production environment. The manufacturer is penalized for long lead times and for missing due dates. To meet due dates, the manufacturer has to obtain components from a supplier. We model this manufacturer and supplier as a two-machine flow shop, consider several variation...

متن کامل

Centralized Versus Decentralized Scheduling and Due Date Quotation in a Make-to-Order Supply Chain

Although there is a vast and growing amount of literature on supply chain coordination, the majority of this literature focuses on make-to-stock systems and performance measures built around service and inventory levels. On the other hand, an increasing number of supply chains are better characterized as make-to-order systems. Fast and on-time delivery is obviously critical for any firm that op...

متن کامل

Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability

In this paper, an integrated machine scheduling withits due date setting problem has been considered. It is assumed that the machine is subject to some kind of random unavailability. Due dates should be set in an attractive and reliable manner, implying that they should be short and possible to be met. To this end, first, long due dates are penalized in the objective function. Then, for each cu...

متن کامل

Make-to-Order Integrated Scheduling and Distribution

Production and distribution are fundamental operational functions in supply chains. The main challenge is to design algorithms that optimize operational performance by jointly scheduling production and delivery of customer orders. In this paper we study a model of scheduling customer orders on multiple identical machines and their distribution to customers afterwards. The goal is to minimize th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Chinese Institute of Industrial Engineers

سال: 2009

ISSN: 1017-0669,2151-7606

DOI: 10.1080/10170660909509119