Simulation of Performance of the Longwall in Underground Coal Mine
نویسندگان
چکیده
منابع مشابه
Field study of longwall coal mine ventilation and bleeder performance
Longwall coal mine operators in the U.S. are required to ventilate multipanel longwall districts, but may have little or no knowledge about what happens to the ventilation air between the inlet evaluation points (IEPs), bleeder evaluation points (BEPs) and bleeder fans. The effectiveness of bleeder performance can directly influence the ability of a ventilation system to remove and dilute coal ...
متن کاملAn Innovative Longwall Mining Technology in Tangshan Coal Mine, China
In mining of inclined coal seams in Tangshan coal mine of Kailuan group, gateways on either end of a panel were both typically located along the floor and a gateway pillar between adjoining panels was left unmined between adjacent panels to ensure stability, thus forming a planar mining system. According to the practice, however, it turned out that this conventional mining system has long-stand...
متن کاملA Study of Mine-Related Seismicity in a Deep Longwall Coal Mine
This study involves seismic monitoring of a deep coal mine. The purpose is to examine the processes responsible for induced seismicity. A seismic network consisting of five threecomponent short-period seismometers located above the mine recorded the seismic data. The events discussed here occurred from March 1, 2009 until April 7, 2011 during the mining of three longwall panels and the data was...
متن کاملthe role of application of dynamic assessment approach in improvement of iranian efl writing performance at different language proficiency levels
the present study sought to investigate the role of dynamic assessment (da) in improvement of iranian efl writing performance at different language proficiency levels. to this end, after conducting the quick placement test, 60 iranian efl learners were assigned to two groups with different language proficiency levels. in both groups each participant wrote two compositions, one before and one af...
Estimation of reliability-based maintenance time intervals of Load-Haul-Dumper in an underground coal mine
Reliability estimation plays a significant role in the performance assessment of mining equipment, and aids in designing efficient and effective preventive maintenance strategies. Continuous and random/irregular occurrence of failures in a system could be the main cause for performance drop of machinery. The accomplishment of a projected level of production is possible only by an efficient oper...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: DEStech Transactions on Computer Science and Engineering
سال: 2018
ISSN: 2475-8841
DOI: 10.12783/dtcse/cmsms2018/25179