Simulation-based estimation for correlated cost elements
نویسندگان
چکیده
منابع مشابه
A Novel ICA-based Estimator for Software Cost Estimation
One of the most important and valuable goal of software development life cycle is software cost estimation or SCE. During the recent years, SCE has attracted the attention of researchers due to huge amount of software project requests. There have been proposed so many models using heuristic and meta-heuristic algorithms to do machine learning process for SCE. COCOMO81 is one of the most popular...
متن کاملa novel ica-based estimator for software cost estimation
one of the most important and valuable goal of software development life cycle is software cost estimation or sce. during the recent years, sce has attracted the attention of researchers due to huge amount of software project requests. there have been proposed so many models using heuristic and meta-heuristic algorithms to do machine learning process for sce. cocomo81 is one of the most popular...
متن کاملchannel estimation for mimo-ofdm systems
تخمین دقیق مشخصات کانال در سیستم های مخابراتی یک امر مهم محسوب می گردد. این امر به ویژه در کانال های بیسیم با خاصیت فرکانس گزینی و زمان گزینی شدید، چالش بزرگی است. مقالات متعدد پر از روش های مبتکرانه ای برای طراحی و آنالیز الگوریتم های تخمین کانال است که بیشتر آنها از روش های خاصی استفاده می کنند که یا دارای عملکرد خوب با پیچیدگی محاسباتی بالا هستند و یا با عملکرد نه چندان خوب پیچیدگی پایینی...
A Neural Network Model Based on Support Vector Machine for Conceptual Cost Estimation in Construction Projects
Estimation of the conceptual costs in construction projects can be regarded as an important issue in feasibility studies. This estimation has a major impact on the success of construction projects. Indeed, this estimation supports the required information that can be employed in cost management and budgeting of these projects. The purpose of this paper is to introduce an intelligent model to im...
متن کاملRisk-Based Cost Estimation
ost estimation for an engineering project traditionally involves development of an “engineer’s estimate” of the project cost to which contingency is added to develop the “total project cost.” Contingency is used to reflect the fact that regardless of the diligence and competence of the estimator, there is uncertainty in the final cost of the project. Material costs change over time, markups and...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Project Management
سال: 2005
ISSN: 0263-7863
DOI: 10.1016/j.ijproman.2004.12.002