Simple heuristics for the assembly line worker assignment and balancing problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simple heuristics for the assembly line worker assignment and balancing problem

We propose simple heuristics for the assembly line worker assignment and balancing problem. This problem typically occurs in assembly lines in sheltered work centers for the disabled. Different from the classical simple assembly line balancing problem, the task execution times vary according to the assigned worker. We develop a constructive heuristic framework based on task and worker priority ...

متن کامل

An algorithm for integrated worker assignment, mixed-model two-sided assembly line balancing and bottleneck analysis

This paper addresses a multi-objective mixed-model two-sided assembly line balancing and worker assignment with bottleneck analysis when the task times are dependent on the worker’s skill. This problem is known as NP-hard class, thus, a hybrid cyclic-hierarchical algorithm is presented for solving it. The algorithm is based on Particle Swarm Optimization (PSO) and Theory of Constraints (TOC) an...

متن کامل

An Analytical Approach for Single and Mixed-Model Assembly Line Rebalancing and Worker Assignment Problem

In this paper, an analytical approach is used for assembly line rebalancing and worker assignment for single and mixed-model assembly lines based on a heuristic-simulation algorithm. This approach helps to managers to select a better marketing strategy when different combinations of demands are suitable.Furthermore, they can use it as a guideline to know which worker assignment is better for ea...

متن کامل

Simultaneous Multi-Skilled Worker Assignment and Mixed-Model Two-Sided Assembly Line Balancing

This paper addresses a multi-objective mathematical model for the mixed-model two-sided assembly line balancing and worker assignment with different skills. In this problem, the operation time of each task is dependent on the skill of the worker. The following objective functions are considered in the mathematical model: (1) minimizing the number of mated-stations (2), minimizing the number of ...

متن کامل

Assembly Line Worker Integration and Balancing Problem

We propose the Assembly Line Worker Integration and Balancing Problem (ALWIBP), a new assembly line balancing problem arising in lines with conventional and disabled workers. The goal of this problem is to maintain high productivity levels by minimizing the number of workstations needed to reach a given output, while including in the assembly line a number of disabled workers. This problem gain...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Heuristics

سال: 2012

ISSN: 1381-1231,1572-9397

DOI: 10.1007/s10732-012-9195-5