SilentPhone: Inferring User Unavailability based Opportune Moments to Minimize Call Interruptions
نویسندگان
چکیده
منابع مشابه
Inferring User-perceived Performance of Network by monitoring TCP Interruptions
The fluctuating performance of wireless and mobile networks has triggered the need for smart algorithms to assess the user perception, resulting from the quality of network services. While efforts have been done to model the user experience resulting from the network performance, there is still the need for practical methods to assess the user-perceived performance, in the real environment. In ...
متن کاملA Collaborative Approach to Minimize Cellphone Interruptions
In this paper, we present a collaborative approach to minimizing inappropriate cellphone interruptions. The approach uses Bluetooth technology to discover and communicate with the surrounding cell phones in order to read their notification profiles. The profile of the majority is assumed to be the most suitable setting for the current social environment. Cellphones running the collaborative ser...
متن کامل3 Scheduling under Unavailability Constraints to Minimize Flow - time Criteria
In this chapter, we consider some practical scheduling problems under unavailability constraints (breakdown periods, maintenance durations and/or setup times). Such problems can be met in different industrial environments and be associated to numerous real-life applications. This explains why many researchers have become interested in this subject. We aim to present the recent approaches propos...
متن کاملScheduling integrated flexible job - shop problem with preventive maintenance to minimize makespan and system unavailability
Integrating flexible job-shop scheduling problem (FJSP) with preventive maintenance (PM) is pondered in this paper. Minimizing the makespan for scheduling part and minimizing the system unavailability for maintenance part are simultaneously under consideration. For doing it, the assignment of n jobs on m machines in production side and executing the PM actions at appropriate time intervals in m...
متن کامل3 Scheduling under Unavailability Constraints to Minimize Flow - time Criteria Imed Kacem
In this chapter, we consider some practical scheduling problems under unavailability constraints (breakdown periods, maintenance durations and/or setup times). Such problems can be met in different industrial environments and be associated to numerous real-life applications. This explains why many researchers have become interested in this subject. We aim to present the recent approaches propos...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: ICST Transactions on Mobile Communications and Applications
سال: 2019
ISSN: 2032-9504
DOI: 10.4108/eai.10-7-2018.155647