Shortest-route formulation of mixed-model assembly line balancing problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Shortest-route formulation of mixed-model assembly line balancing problem

A shortest-route formulation of the mixed-model assembly line balancing problem is presented. Common tasks across models are assumed to exist and these tasks are performed in the same stations. The formulation is based on an algorithm which solves the single-model version of the problem. The mixed-model system is transformed into a singlemodel system with a combined precedence diagram. The mode...

متن کامل

Mixed-Model Assembly Line Balancing with Considering Reliability

This paper presents a multi-objective simulated annealing algorithm for the mixed-model assembly line balancing with stochastic processing times. Since, the stochastic task times may have effects on the bottlenecks of a system, maximizing the weighted line efficiency (equivalent to the minimizing the number of station), minimizing the weighted smoothness index and maximizing the system reliabil...

متن کامل

Solving a multi-objective mixed-model assembly line balancing and sequencing problem

This research addresses the mixed-model assembly line (MMAL) by considering various constraints. In MMALs, several types of products which their similarity is so high are made on an assembly line. As a consequence, it is possible to assemble and make several types of products simultaneously without spending any additional time. The proposed multi-objective model considers the balancing and sequ...

متن کامل

‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSIS

With the growth in customers’ demand diversification, mixed-model U-lines (MMUL) have acquired increasing importance in the area of assembly systems. There are generally two different approaches in the literature for balancing such systems. Some researchers believe that since the types of models can be very diverse, a balancing approach without simultaneously sequencing of models will not yield...

متن کامل

genetic algorithms for assembly line balancing problem

there are some machineries and equipments as well as relatively fix amount of human resources involved in any production process. in many cases, by observing operational method of a process, one may see that some of these machineries are not working, but on the other hand, other equipments are continuously working, and many parts are set in front of them, waiting to be set up over machines to c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 1999

ISSN: 0377-2217

DOI: 10.1016/s0377-2217(98)00115-5