Short-term Rail Rolling Stock Rostering and Maintenance Scheduling

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Rolling Stock Rostering Optimization Under Maintenance Constraints

This paper presents an integer programming formulation for integrating maintenance planning tasks in the railway rolling stock circulation problem. This is a key problem in railway rostering planning that requires to cover a given set of services and maintenance works with a minimum amount of rolling stock units. An additional objective is to limit the number of empty rides. The constraints of ...

متن کامل

Short-term site-wide maintenance scheduling

Preventive maintenance is essential for every chemical production site to prevent failure and accidents, however it upsets material and utility flows inside the site and also causes production loss. In order to minimize the loss, maintenance of each plant unit has to be carefully scheduled together with considerations on site-wide material and utility balances. This will involve both production...

متن کامل

Long Term Cost Effective Preventive Maintenance Scheduling

Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...

متن کامل

Solving Rolling Stock Scheduling Problems at SNCF

We present a generic mathematical modeling approach for solving rolling stock scheduling problems. Our approach is based on a time-space network and a multi-commodity flow model; in order to deal with the various types of rolling stock scheduling problems faced by SNCF planners, it integrates numerous modeling settings and features including maintenance routing requirements which are treated by...

متن کامل

Integrated Train Timetabling and Rolling Stock Scheduling Model Based on Time-Dependent Demand for Urban Rail Transit

1 The congestion problem of urban transportation is becoming increasingly critical for many 2 metropolises. The Urban Rail Transit (URT) system has attracted substantial attention due to its 3 safety, high speed, high capacity and sustainability. With a focus on providing a holistic 4 modelling framework for train scheduling problems, this paper proposes a novel optimization 5 methodology that ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Transportation Research Procedia

سال: 2014

ISSN: 2352-1465

DOI: 10.1016/j.trpro.2014.10.044