Settlement Response of a Multi-Story Building

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Towards Production Control on Multi-Story Building Construction Sites

This paper reports a construction site intervention that is part of a research program devoted to the topic of production control in multi-story building construction. An early work by the authors introduced a preplanning method using the line of balance technique. This present work aggregates some tools previously used such as the Last Planner and Lookahead planning in order to develop a produ...

متن کامل

Cellular response to ionizing radiation: A microRNA story

MicroRNAs (miRNAs) represent a class of small non-coding RNA molecules that regulate gene expression at the post-transcriptional level. They play a crucial role in diverse cellular pathways. Ionizing radiation (IR) is one of the most important treatment protocols for patients that suffer from cancer and affects directly or indirectly cellular integration. Recently it has been discovered that mi...

متن کامل

A Multi-Scenario Zero-Energy Building Techno-Economic Case Study Analysis for a Renovation of a Residential Building

According to the previous pieces of research, the building sector consumes about 40 % of total yield energy and produce one-third of GHG pollution emission. This point shows the significant potential in two aspects of energy optimization and pollution reduction in this field. The purpose of this research as a case study is to construct a residential building and develop the paths for reaching a...

متن کامل

Active Control of Cross Wind Response of 76-Story Tall Building Using a Fuzzy Controller

This paper focuses on the benchmark problem application regarding the vibration control of tall buildings under cross wind excitation. The building under consideration is the 76-story, 306-m tall reinforced concrete office tower proposed for the city of Melbourne, Australia. The adopted control scheme consists of an active tuned mass damper ATMD where the control action is achieved by a fuzzy l...

متن کامل

Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem

Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Engineering, Technology & Applied Science Research

سال: 2020

ISSN: 1792-8036,2241-4487

DOI: 10.48084/etasr.3757