Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness–tardiness costs on a single machine
نویسندگان
چکیده
منابع مشابه
Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine
In this paper, it is investigated how to sequence jobs with fuzzy processing times and predict their due dates on a single machine such that the total weighted possibilistic mean value of the weighted earliness–tardiness costs is minimized. First, an optimal polynomial time algorithm is put forward for the scheduling problem when there are no precedence constraints among jobs. Moreover, it is s...
متن کاملSingle .machine Total Weighted Tardiness with Release Dates Single Machine Total Weighted Tardiness with Release Dates
The single machine total weighted tardiness with release dates problem is known to be strongly NP-hard. With a new lower bounding scheme and a new upper bounding scheme, we get an efficient branch and bound algorithm. In the paper, we first introduce the history of the problem and its computational complexity. Second, the lower bounding schemes and the upper bounding schemes are described in de...
متن کاملA Multi-Objective Particle Swarm Optimization Algorithm for a Possibilistic Open Shop Problem to Minimize Weighted Mean Tardiness and Weighted Mean Completion Times
We consider an open shop scheduling problem. At first, a bi-objective possibilistic mixed-integer programming formulation is developed. The inherent uncertainty in processing times and due dates as fuzzy parameters, machine-dependent setup times and removal times are the special features of this model. The considered bi-objectives are to minimize the weighted mean tardiness and weighted mean co...
متن کاملA Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness
This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Computers & Mathematics with Applications
سال: 2011
ISSN: 0898-1221
DOI: 10.1016/j.camwa.2011.09.063