Sequencing to Minimize Work Overload in Assembly Lines with Product Options
نویسندگان
چکیده
منابع مشابه
Assembly line balancing to minimize balancing loss and system loss
Assembly Line production is one of the widely used basic principles in production system. The problem of Assembly Line Balancing deals with the distribution of activities among the workstations so that there will be maximum utilization of human resources and facilities without disturbing the work sequence. Research works reported in the literature mainly deals with minimization of idle time i.e...
متن کاملSoftware Product-Lines: What To Do When Enumaration Won't Work
The history of research on the development of program-families is briefly reviewed. Two distinct problems, configuration-management and family-design are identified. It is explained that, while software configuration-management is not fundamentally different from configurationmanagement for other products, in practice, inadequate attention to family-design exacerbates all problems associated wi...
متن کاملassembly line balancing to minimize balancing loss and system loss
assembly line production is one of the widely used basic principles in production system. the problem of assembly line balancing deals with the distribution of activities among the workstations so that there will be maximum utilization of human resources and facilities without disturbing the work sequence. research works reported in the literature mainly deals with minimization of idle time i.e...
متن کاملSequencing Mixed Model Assembly Line Problem to Minimize Line Stoppages Cost by a Modified Simulated Annealing Algorithm Based on Cloud Theory
This research presents a new application of the cloud theory-based simulated annealing algorithm to solve mixed model assembly line sequencing problems where line stoppage cost is expected to be optimized. This objective is highly significant in mixed model assembly line sequencing problems based on just-in-time production system. Moreover, this type of problem is NP-hard and solving this probl...
متن کاملBi–Directional Work-Sharing in Assembly Lines with Strict and Flexible Assembly Sequences
Work-sharing between stations in assembly lines can reduce cycle time and improve throughput rate. This research addresses assembly lines in which tasks may be shared with their immediate upstream or downstream stations only. The study consists of three stages. In the first stage, we assume that all work content in the line can be shared. Then, the balanceability of the line, which is defined a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Management Science
سال: 1991
ISSN: 0025-1909,1526-5501
DOI: 10.1287/mnsc.37.5.572