SEQUENCE-DEPENDENT SETUP AND CLEAN-UP TIMES IN A TWO-MACHINE JOB-SHOP WITH MINIMIZING MAKESPAN

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

Sequence-Dependent Setup Times in a Two-Machine Job-Shop with Minimizing the Schedule Length

This article addresses the job-shop problem of minimizing the schedule length (makespan) for processing n jobs on two machines with sequence-dependent setup times and removal times. The processing of each job includes at most two operations that have to be non-preemptive. Machine routes may differ from job to job. If all setup and removal times are equal to zero, this problem is polynomially s...

متن کامل

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...

متن کامل

Sequence-Dependent Setup and Removal Times in a Two-Machine Job-Shop with Minimizing the Schedule Length

This article addresses the job-shop problem of minimizing the schedule length (makespan) for processing n jobs on two machines with sequence-dependent setup and removal times. The processing of each job includes at most two operations that have to be non-preemptive. Machine routes may differ from job to job. If all setup and removal times are equal to zero, this problem is polynomially solvable...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC Proceedings Volumes

سال: 2006

ISSN: 1474-6670

DOI: 10.3182/20060517-3-fr-2903.00034