Semi-Open Multi-Distribution Center Path Planning with Time Windows
نویسندگان
چکیده
A well-planned robot dispatching platform reduces costs and increases efficiency for companies while also reducing carbon emissions achieving sustainable development. At the moment, solution to difficulty of warehouse logistics is use multiple distribution centers with autonomous mobile robots (AMR). To solve this problem, paper establishes a semi-closed model centers, considering number cycles vehicles. An improved ant colony algorithm proposed improve heuristic function based on node distance relationship quality path search. Dynamic variable pheromone concentration volatility factors are set accelerate convergence speed effectively problem premature algorithm. The traditional used established model. In addition, results show that has certain rate dominance in single-day cost closed model, but overall comprehensive lower than semi-open multi-distribution center 7 day average reduced by 12%. can save about 119 kWh electricity under same target volume requirement, which achieves company’s goals reduction increased efficiency, as well green
منابع مشابه
Optimal Multi-Objective Planning of Distribution System with Distributed Generation
This paper presents a multi-objective formulation for optimal siting and sizing of distributed generation (DG) resources in distribution systems in order to minimize the cost of power losses and energy not supplied. The implemented technique is based on a genetic algorithm (GA) and weight method that employed to obtain the best compromise between these costs. Simulation results on 33-bus distri...
متن کاملA multi-criteria vehicle routing problem with soft time windows by simulated annealing
This paper presents a multi-criteria vehicle routing problem with soft time windows (VRPSTW) to mini-mize fleet cost, routes cost, and violation of soft time windows penalty. In this case, the fleet is heterogene-ous. The VRPSTW consists of a number of constraints in which vehicles are allowed to serve customers out of the desirable time window by a penalty. It is assumed that this relaxation a...
متن کاملA Multi-district Asset Protection Problem with Time Windows for Disaster Management
One of the most important goals of disaster management teams is to protect the assets and infrastructures of the community in the event of accidents such as wildfires and floods. This issue requires appropriate operations of all disaster management teams and analysis of available information for suitable decision making and consequently timely response. A mixed integer mathematical model is pre...
متن کاملAn Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows
This paper presents a new model of two-echelon periodic supply vessel planning problem with time windows mix of facility location (PSVPTWMFL-2E) in an offshore oil and gas industry. The new mixed-integer nonlinear programming (MINLP) modelconsists ofa fleet composition problem and a location-routing problem (LRP). The aim of the model is to determine the size and type of large vessels in the fi...
متن کاملNear-Minimum-Time Motion Planning of Manipulators along Specified Path
The large amount of computation necessary for obtaining time optimal solution for moving a manipulator on specified path has made it impossible to introduce an on line time optimal control algorithm. Most of this computational burden is due to calculation of switching points. In this paper a learning algorithm is proposed for finding the switching points. The method, which can be used for both ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2023
ISSN: ['2071-1050']
DOI: https://doi.org/10.3390/su15064800