Selection Rule for Meson Problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Heavy-Meson Decays and the Selection Rule |DI|&lt

made at Qight times of ~10 sec from the target yield the same lifetime, within statistical errors, for the E 2, E„~,and 7 mesons. ' 4 These facts, together with the fact that the tau should not decay into two pions, ' suggest either that there is a single kind of E-meson with lifetime 10 ' sec which decays to L-mesons and has a significant branching ratio for gamma decay to a slightly lighter E...

متن کامل

NEW CRITERIA FOR RULE SELECTION IN FUZZY LEARNING CLASSIFIER SYSTEMS

Designing an effective criterion for selecting the best rule is a major problem in theprocess of implementing Fuzzy Learning Classifier (FLC) systems. Conventionally confidenceand support or combined measures of these are used as criteria for fuzzy rule evaluation. In thispaper new entities namely precision and recall from the field of Information Retrieval (IR)systems is adapted as alternative...

متن کامل

Sum Rule for Heavy Meson Decay Widths

A sum rule relating the widths of the decays of mesons belonging to heavy quark multiplets, having the same parity and light quark spin j, into the low lying 0 and 1 multiplet is obtained. As this sum rule follows from properties of the axial charges, it is protected from heavy quark spin dependent 1/mQ corrections. The sum rule works well for mesons containing a heavy charmed quark and, surpri...

متن کامل

A Nadir Compromise Programming for Supplier Selection Problem under Uncertainty

Supplier selection is one of the influential decisions for effectiveness of purchasing and manufacturing policies under competitive conditions of the market. Regarding the fact that decision makers (DMs) consider conflicting criteria for selecting suppliers, multiple-criteria programming is a promising approach to solve the problem. This paper develops a nadir compromise programming (NCP) model...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Progress of Theoretical Physics

سال: 1950

ISSN: 0033-068X

DOI: 10.1143/ptp.4.389