A Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...
متن کاملTwo-Machine Flowshop Batching and Scheduling
We consider in this paper a two-machine flowshop scheduling problem in which the first machine processes jobs individually while the second machine processes jobs in batches. The forming of each batch on the second machine incurs a constant setup time. The objective is to minimize the makespan. This problem was previously shown to be NP-hard in the ordinary sense. In this paper, we first presen...
متن کاملAppling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...
متن کاملScheduling a Batching Machine
We address the problem of scheduling n jobs on a batching machine to minimize regular scheduling criteria that are non-decreasing in the job completion times. A batching machine is a machine that can handle up to b jobs simultaneously. The jobs that are processed together form a batch, and all jobs in a batch start and complete at the same time. The processing time of a batch is equal to the la...
متن کاملTwo-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes
We schedule the jobs from two agents on a single parallel-batching machine with equal processing time and non-identical job sizes. The objective is to minimize the makespan of the first agent subject to an upper bound on the makespan of the other agent. We show that there is no polynomial-time approximation algorithm for solving this problem with a finite worst-case ratio, unless P = NP. Then, ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Discrete Applied Mathematics
سال: 1997
ISSN: 0166-218X
DOI: 10.1016/s0166-218x(96)00039-x