Scheduling vessels and container-yard operations with conflicting objectives
نویسندگان
چکیده
منابع مشابه
Scheduling vessels and container-yard operations with conflicting objectives
__________________________________________________________ We consider the problem of coordinating the operations of two supply chain partners: a foreign shipping company and a domestic port. The two partners have conflicting business objectives, and the issue is to determine the optimal cycle time, by which the shipping company removes the empty containers from the domestic port, so that the j...
متن کاملQuay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...
متن کاملYard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملSimulation and Optimization of Container Yard Operations: A survey
Management of container terminal operations is essentially the allocation and scheduling of the expensive resources such as berths, quay cranes, storage space, yard cranes, and container carriers. Each of these resources plays an indispensable role in the interlocking processes in a container terminal. In this survey we give a critical review and a comparative study on various decision problems...
متن کاملDiscrete time model and algorithms for container yard crane scheduling
Container terminal (CT) operations are often bottlenecked by slow YC (yard crane) movements. PM (prime mover) queues in front of the YCs are common. Hence, efficient YC scheduling to reduce the PM waiting time is critical in increasing a CT’s throughput. We develop an efficient model for YC scheduling by taking into account realistic operational constraints such as inter-crane interference, fix...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Annals of Operations Research
سال: 2007
ISSN: 0254-5330,1572-9338
DOI: 10.1007/s10479-007-0260-7