Scheduling Three Stage Flowshop Processes with No Intermediate Storage Using Novel Matrix Approach
نویسندگان
چکیده
منابع مشابه
Bi-criteria Three Stage Fuzzy Flowshop Scheduling with Transportation Time and Job Block Criteria
Scheduling is an enduring process where the existence of real time information frequently forces the review and modification of pre-established schedules. The real world is complex and complexity generally arises from uncertainty. From this prospective the concept of fuzziness is introduced in the field of scheduling. The present paper pertains to a bi-criterion in n-jobs, three machines fl...
متن کاملFlexible Flowshop with Limited Intermediate Storage
In this project, we first planned to model a manufacturing system using a partial differential equation (PDE), since in the theory of traffic simulation and control, PDEs are used successfully for modeling the dynamic behavior of highway traffic. Because these traffic models show good correspondence with manufacturing systems (vehicles = products, highway = manufacturing system), PDEs can also ...
متن کاملA Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...
متن کاملThe three stage assembly permutation flowshop scheduling problem
The assembly flowshop scheduling problem has been studied recently due to its applicability in real life scheduling problems. It arises when various fabrication operations are performed concurrently in one stage. It was firstly introduced by Lee et al. (1993) in a flowshop environment. Later, Potts et al. (1995) considered the two-stage assembly flowshop problem with m concurrent operations in ...
متن کاملNo-wait flexible flowshop scheduling with no-idle machines
This paper considers a two-stage flexible flowshop scheduling problem with no waiting time between two sequential operations of a job and no idle time between two consecutive processed jobs on machines of the second stage. We show its complexity and present a heuristic algorithm with asymptotically tight error bounds. © 2004 Elsevier B.V. All rights reserved.
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Applied Sciences
سال: 2008
ISSN: 1812-5654
DOI: 10.3923/jas.2008.2136.2141