Scheduling policies in flexible Bernoulli lines with dedicated finite buffers

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

متن کامل

Maximizing the Throughput of Tandem Lines with Flexible Failure-Prone Servers and Finite Buffers

Consider a tandem queueing network with an infinite supply of jobs in front of the first station, infinite room for completed jobs after the last station, finite buffers between stations, and a number of flexible servers who are subject to failures. We study the dynamic assignment of servers to stations with the goal of maximizing the long-run average throughput. Our main conclusion is that the...

متن کامل

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

Modelling and Scheduling Lot Streaming Flexible Flow Lines

Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...

متن کامل

Stochastic Production Systems: Production and Maintenance Scheduling with Finite Buffers

Consider the production of a single consumable product that is fabricated in a process of stages that is subject to an uncertain environment. There are a number of workstations on each stage that have different operating parameters. The workstations are subject to the discrete events of repair, failure, and preventive maintenance that generate a jump in the state of the system. Between each sta...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Manufacturing Systems

سال: 2018

ISSN: 0278-6125

DOI: 10.1016/j.jmsy.2018.05.013