Scheduling parallel CNC machines with time/cost trade-off considerations
نویسندگان
چکیده
منابع مشابه
Scheduling parallel CNC machines with time/cost trade-off considerations
When the processing times of jobs are controllable, selected processing times affect both themanufacturing cost and the scheduling performance.Awell-known example for such a case that this paper specifically deals with is the turning operation on a CNCmachine. Manufacturing cost of a turning operation is a nonlinear convex function of its processing time. We also know that scheduling decisions ...
متن کاملFlexible flowshop scheduling with equal number of unrelated parallel machines
This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...
متن کاملbicriteria scheduling in hybrid flow shop with unrelated parallel machines
this study considers scheduling in hybrid flow shop environment with unrelated parallel machines for minimizing mean of job's tardiness and mean of job's completion times. this problem does not study in the literature, so far. flexible flow shop environment is applicable in various industries such as wire and spring manufacturing, electronic industries and production lines. after mode...
متن کاملflexible flowshop scheduling with equal number of unrelated parallel machines
this article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. the objective is to minimize the makespan for a given set of jobs in the system. this problem class is np-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. a number of test problems are randomly ge...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Computers & Operations Research
سال: 2007
ISSN: 0305-0548
DOI: 10.1016/j.cor.2005.10.018