Scheduling of deteriorating jobs with release dates to minimize the maximum lateness

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Batch scheduling to minimize maximum lateness

We address the single-machine batch scheduling problem which arises when there are job families and setup requirements exist between these families; our objective is to minimize the maximum lateness. As our main result, we give an improved dynamic program for the solution of the problem. © 1997 Elsevier Science B.V. Kevwords: Analysis of algorithms; Dynamic programming; Production/scheduling

متن کامل

Scheduling jobs with release dates and tails on two unrelated parallel machines to minimize the makespan

In this paper we deal with the problem of assigning a set of n jobs, with release dates and tails, to either one of two unrelated parallel machines and scheduling each machine so that the makespan is minimized. This problem will be denoted by R2jri; qijCmax. The model generalizes the problem on one machine 1jri; qijCmax, for which a very ecient algorithm exists. In this paper we describe a Bra...

متن کامل

Scheduling on uniform parallel machines to minimize maximum lateness

We consider the uniform parallel machine scheduling problem with the objective of minimizing maximum lateness. We show that an extension of the EDD rule to a uniform parallel machine setting yields a maximum lateness value which does not exceed the optimal value by more than pmax, where pmax is the maximum job processing time. c © 2000 Elsevier Science B.V. All rights reserved.

متن کامل

Parallel Batch Scheduling of Deteriorating Jobs with Release Dates and Rejection

We consider the unbounded parallel batch scheduling with deterioration, release dates, and rejection. Each job is either accepted and processed on a single batching machine, or rejected by paying penalties. The processing time of a job is a simple linear increasing function of its starting time. The objective is to minimize the sum of the makespan of the accepted jobs and the total penalty of t...

متن کامل

A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs

Article history: Received 10 March 2010 Received in revised form July, 25, 2011 Accepted 26 July 2011 Available online 27 July 2011 This paper presents a mathematical model for the problem of minimizing the maximum lateness on a single machine when the deteriorated jobs are delivered to each customer in various size batches. In reality, this issue may happen within a supply chain in which deliv...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Theoretical Computer Science

سال: 2012

ISSN: 0304-3975

DOI: 10.1016/j.tcs.2012.08.022