Scheduling of coupled tasks and one-machine no-wait robotic cells

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling of coupled tasks and one-machine no-wait robotic cells

Coupled task scheduling problems were first studied more than 25 years ago. Several complexity results have been established in the meantime, but the status of the identical task case still remains unsettled. We describe a new class of equivalent one-machine no-wait robotic cell problems. It turns out that scheduling of identical coupled tasks corresponds to the production of a single part type...

متن کامل

Part sequencing in three-machine no-wait robotic cells

A no-wait robotic cell is an automated ow shop in which a robot is used to move the parts from a machine to the next. Parts are not allowed to wait. We analyze the complexity of the part sequencing problem in a robotic cell with three machines, for di erent periodical patterns of robot moves, when the objective is productivity maximization. c © 2000 Elsevier Science B.V. All rights reserved.

متن کامل

Mixed Integer Linear Programs for Blocking and No Wait Job Shop Scheduling Problems in Robotic cells

This paper studies the problem of scheduling Job shops in robotic cells with no intermediate buffers, called No Wait Blocking Transport Job Shop Scheduling Problem (NWBT JSSP). This problem is an extension of the classical job shop problem. No Wait Blocking Transport job shop problems arise in many realistic production environments. To tackle this problem, we developed a Mixed Integer Linear Pr...

متن کامل

Mixed Integer Linear Programs for Blocking and No Wait Job Shop Scheduling Problems in Robotic cells

This paper studies the problem of scheduling Job shops in robotic cells with no intermediate buffers, called No Wait Blocking Transport Job Shop Scheduling Problem (NWBT JSSP). This problem is an extension of the classical job shop problem. No Wait Blocking Transport job shop problems arise in many realistic production environments. To tackle this problem, we developed a Mixed Integer Linear Pr...

متن کامل

Solving Re-entrant No-wait Flow Shop Scheduling Problem

In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computers & Operations Research

سال: 2009

ISSN: 0305-0548

DOI: 10.1016/j.cor.2007.10.003