Scheduling Multiple Yard Cranes with Crane Interference and Safety Distance Requirement
نویسندگان
چکیده
منابع مشابه
Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...
متن کاملYard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملA Yard Crane Scheduling Problem with Practical Constraints
The problem considered in this paper is to locate storage containers while a set of container storage and retrieval requests are sequenced. Two automated cranes stack and retrieve containers in a single block of a yard. The cranes cannot pass each other and must be separated by a safety distance. Storage containers are initially located at the seaside and landside input/output (I/O) points of t...
متن کاملScheduling Twin Yard Cranes in a Container Block
Full terms and conditions of use: http://pubsonline.informs.org/page/terms-and-conditions This article may be used only for the purposes of research, teaching, and/or private study. Commercial use or systematic downloading (by robots or other automatic processes) is prohibited without explicit Publisher approval, unless otherwise noted. For more information, contact [email protected]. The...
متن کاملDiscrete time model and algorithms for container yard crane scheduling
Container terminal (CT) operations are often bottlenecked by slow YC (yard crane) movements. PM (prime mover) queues in front of the YCs are common. Hence, efficient YC scheduling to reduce the PM waiting time is critical in increasing a CT’s throughput. We develop an efficient model for YC scheduling by taking into account realistic operational constraints such as inter-crane interference, fix...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Transportation Science
سال: 2015
ISSN: 0041-1655,1526-5447
DOI: 10.1287/trsc.2015.0641