Scheduling malleable tasks with precedence constraints

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling tasks with AND/OR precedence constraints

In traditional precedence-constrained scheduling a task is ready to execute when all its predecessors are complete. We call such a task an AND task. In this paper we allow certain tasks to be ready when just one of their predecessors is complete. These tasks are known as OR tasks. We analyze the complexity of two types of real-time AND/OR task scheduling problems. In the rst type of problem, al...

متن کامل

Scheduling and Packing Malleable Tasks with Precedence Constraints of Bounded Width

We study two related problems in non-preemptive scheduling and packing of malleable tasks with precedence constraints to minimize the makespan. We distinguish the scheduling variant, in which we allow the free choice of processors, and the packing variant, in which a task must be assigned to a contiguous subset of processors. For precedence constraints of bounded width, we completely resolve th...

متن کامل

Scheduling and packing malleable and parallel tasks with precedence constraints of bounded width

We study the problems of non-preemptively scheduling and packing malleable and parallel tasks with precedence constraints to minimize the makespan. In the scheduling variant, we allow the free choice of processors; in packing, each task must be assigned to a contiguous subset. Malleable tasks can be processed on different numbers of processors with varying processing times, while parallel tasks...

متن کامل

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

Layer-Based Scheduling Algorithms for Multiprocessor-Tasks with Precedence Constraints

c © 2007 by John von Neumann Institute for Computing Permission to make digital or hard copies of portions of this work for personal or classroom use is granted provided that the copies are not made or distributed for profit or commercial advantage and that copies bear this notice and the full citation on the first page. To copy otherwise requires prior specific permission by the publisher ment...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Computer and System Sciences

سال: 2012

ISSN: 0022-0000

DOI: 10.1016/j.jcss.2011.04.003