Scheduling just-in-time part supply for mixed-model assembly lines

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling just-in-time part supply for mixed-model assembly lines

With increasing cost competition and product variety, providing an efficient Just-inTime (JIT) supply has become one of the greatest challenges in the use of mixedmodel assembly line production systems. In the present paper, therefore, we propose a new approach for scheduling JIT part supply from a central storage center. Usually, materials are stored in boxes that are allotted to the consumpti...

متن کامل

Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line

This paper focuses on the scheduling of a single vehicle, which delivers parts from a storage centre to workstations in a mixed-model assembly line. In order to avoid part shortage and to cut down total inventory holding and travelling costs, the destination workstation, the part quantity and the departure time of each delivery has to be specified properly according to predetermined assembly se...

متن کامل

Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets

Line-integrated supermarkets constitute a novel in-house parts logistics concept for feeding mixed-model assembly lines. In this context, supermarkets are decentralized logistics areas located directly in each station. Here, parts are withdrawn from their containers by a dedicated logistics worker and sorted just-in-sequence (JIS) into a JIS-bin. From this bin, assembly workers fetch the parts ...

متن کامل

Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines

In recent years, more and more automobile producers adopted the supermarketconcept to enable a exible and reliable Just-in-Time (JIT) part supply of their mixed-model assembly lines. Within this concept, a supermarket is a decentralized in-house logistics area where parts are intermediately stored and then loaded on small tow trains. These tow trains travel across the shop oor on speci c routes...

متن کامل

A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 2011

ISSN: 0377-2217

DOI: 10.1016/j.ejor.2010.10.029