Scheduling cranes to retrieve steel coils in a warehouse
نویسندگان
چکیده
منابع مشابه
Crane scheduling in a warehouse storing steel coils
This article studies a single-crane scheduling problem in a warehouse where steel coils are stored in two levels. A given set of coils is to be retrieved from their designated places. If a required coil at the lower level is blocked by one or two coils at the upper level, to retrieve it, the blocking coils must be first moved to other positions. The considered problem is to determine the new po...
متن کاملScheduling Twin Yard Cranes in a Container Block
Full terms and conditions of use: http://pubsonline.informs.org/page/terms-and-conditions This article may be used only for the purposes of research, teaching, and/or private study. Commercial use or systematic downloading (by robots or other automatic processes) is prohibited without explicit Publisher approval, unless otherwise noted. For more information, contact [email protected]. The...
متن کاملA Solution to View Management to Build a Data Warehouse
Several techniques exist to select and materialize a proper set of data in a suitable structure that manage the queries submitted to the online analytical processing systems. These techniques are called view management techniques, which consist of three research areas: 1) view selection to materialize, 2) query processing and rewriting using the materialized views, and 3) maintaining materializ...
متن کاملAn implicit gain-scheduling controller for cranes
To improve the efficiency of cargo handling with cranes it is necessary to control the crane trolley position so that the swing of the hanging load is minimized. In this paper we consider a linear parameter-varying model of the crane, where the time-varying parameter is the length of the suspending rope. We consider the set of models given by frozen values of the rope length and show how all th...
متن کاملScheduling multiple factory cranes on a common track
We describe a heuristic algorithm for scheduling the movement of multiple factory cranes mounted on a common track. The cranes must complete a sequence of tasks at locations along the track without crossing paths, while adhering as closely as possible to a factory production schedule. The algorithm creates a decision tree of possible states of the crane system, which evolves over time as tasks ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2016
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2016.07.576