Scheduling coupled-operation jobs with exact time-lags
نویسندگان
چکیده
منابع مشابه
Polynomial-time approximation schemes for scheduling problems with time lags
We identify two classes of machine scheduling problems with time lags that possess Polynomial-Time Approximation Schemes (PTASs). These classes together, one for minimizing makespan and one for minimizing total completion time, include many well-studied time lag scheduling problems. The running times of these approximation schemes are polynomial in the number of jobs, but exponential in the num...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملFlow shop scheduling with multiple operations and time lags
A scheduling system is proposed and developed for a special type of flow shop. In this flow shop there is one machine at each stage. A job may require multiple operations at each stage. The first operation of a job on stage j cannot start until the last operation of the job on stage j-1 has finished. Preemption of the operations of a job is not allowed. The flow shop that we consider has anothe...
متن کاملMinimizing the Number of Tardy Jobs in a Permutation Flowshop Scheduling Problem with Setup Times and Time Lags Constraints
This paper studies the permutation flowshop scheduling problem with sequence dependent setup times and time lags constraints minimizing the number of tardy jobs. Dependent setup times are defined as the work to prepare the machines between two successive jobs. Time lags are defined as intervals of time that must exist between every couple of successive operations of the same job. Two mathematic...
متن کاملScheduling with Incompatible Jobs
We consider scheduling problems in a multiprocessor system with incompatible jobs (two incompatible jobs cannot be processed by the same machine). We consider the problem to minimize the maximum job completion time. the makespan. This problem is NP-complete. We present a number of polynomial time approximation algorithms for this problem where the job incompatibilities possess a special structu...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Discrete Applied Mathematics
سال: 2012
ISSN: 0166-218X
DOI: 10.1016/j.dam.2012.05.026