Scheduling coupled-operation jobs with exact time-lags

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Polynomial-time approximation schemes for scheduling problems with time lags

We identify two classes of machine scheduling problems with time lags that possess Polynomial-Time Approximation Schemes (PTASs). These classes together, one for minimizing makespan and one for minimizing total completion time, include many well-studied time lag scheduling problems. The running times of these approximation schemes are polynomial in the number of jobs, but exponential in the num...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

Flow shop scheduling with multiple operations and time lags

A scheduling system is proposed and developed for a special type of flow shop. In this flow shop there is one machine at each stage. A job may require multiple operations at each stage. The first operation of a job on stage j cannot start until the last operation of the job on stage j-1 has finished. Preemption of the operations of a job is not allowed. The flow shop that we consider has anothe...

متن کامل

Minimizing the Number of Tardy Jobs in a Permutation Flowshop Scheduling Problem with Setup Times and Time Lags Constraints

This paper studies the permutation flowshop scheduling problem with sequence dependent setup times and time lags constraints minimizing the number of tardy jobs. Dependent setup times are defined as the work to prepare the machines between two successive jobs. Time lags are defined as intervals of time that must exist between every couple of successive operations of the same job. Two mathematic...

متن کامل

Scheduling with Incompatible Jobs

We consider scheduling problems in a multiprocessor system with incompatible jobs (two incompatible jobs cannot be processed by the same machine). We consider the problem to minimize the maximum job completion time. the makespan. This problem is NP-complete. We present a number of polynomial time approximation algorithms for this problem where the job incompatibilities possess a special structu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Discrete Applied Mathematics

سال: 2012

ISSN: 0166-218X

DOI: 10.1016/j.dam.2012.05.026